Nate Jones, CPCU, has verified from the agency’s own experience that, nationwide, a small excavating business pays around $500–$1,200+/yr for general liability. He has verified a full program above $2,000–$7,000+/yr as the contractor grows. What a given bid requires comes from the documents of the job in hand.
The exhibit is the answer, and it reads best as a table
The insurance a bid requires is whatever its documents say, and each owner, general contractor or public agency may write its own. A package may ask for a short list or run to pages of endorsement language. Length says nothing about your company. It says who wrote the package, and it may say what that party has run into before. A long exhibit can be a record of past trouble written into a form.
So the working habit is to find the page. It may be headed insurance requirements, it may be an exhibit, or it may be an article in the general conditions or a section of the subcontract. Addenda can change it after you have read it, so write down the date of the version you used.
Once you have the page, treat it as a table and not as a block of text. Give each requirement its own row, and beside it write the policy that would answer it, the endorsement that would be needed, or a note that you do not know yet.
The row types worth building on an excavation bid are auto, umbrella, equipment, additional insured wording, waiver of subrogation, primary and non-contributory wording, certificate holder details and notice terms. General liability and workers’ compensation sit in the table too, and they get a short section of their own below. The rows that stay blank are the ones to take to your agent. A blank row is not a failure on your part. It is a question you have found before the bid is due, when the answer can still change what you price or whether you bid.
The auto row
An exhibit can ask for commercial auto because a dig depends on trucks and trailers. The row asks whether the vehicles that haul your machines and your crew are insured for liability on the road, at limits the exhibit may name.
Read how the exhibit names the vehicles. Owned, hired and non-owned may each appear, and the policy has to be written to match what you use. The commercial auto page describes the line and how it differs from the liability that follows a machine on a site.
Walk your own yard against that wording. List each truck, each trailer that carries a machine, and the person who drives each. Add the trucks you hire for hauling spoil or stone, because a hired truck may sit under different wording from one you own. Add the pickup a foreman drives to the site, since a vehicle used for work may fall under the row even when no one thinks of it as a work truck.
If your crew pulls a trailer behind a pickup, tell the agent. The way a vehicle is used, and by whom, is part of how the form is written.
The umbrella row
The umbrella row asks for more total limit sitting above other policies. The exhibit may list the underlying policies it expects the umbrella to rise over, and the umbrella has to name them to respond over them.
The detail to check is the underlying list. If the exhibit expects the umbrella to lift auto, general liability and employer’s liability, find out whether the umbrella names all of them. An umbrella built over only some of them does not respond over the rest because the exhibit wanted it to.
Read the limit the exhibit wants beside the work it is attached to. A package for a large site may ask for a higher limit than a package for a small repair, and the same exhibit can ask different things of different trades. Mark which rows are tied to the whole contract and which are tied to a part of the work, then ask your agent whether the umbrella can be written to that shape.
The umbrella page describes the line. Whether the limit an exhibit wants is available, and at what cost, is for your agent to find out, and we make no promise about it.
The equipment row
An exhibit can ask for equipment insurance when a lender, a lease or an owner who supplied machines wants proof that the machines are protected. The row points to a line written around a schedule of your fleet.
If the exhibit names an item or asks for a loss payee, the schedule has to say so. The contractors equipment page describes the line. For valuation and the edges of a form, read plant and equipment insurance.
A rented machine is a separate question, because the rental contract may place responsibility for the machine on you. Put the rental terms in front of the agent early. The same goes for a machine the owner of the site lends you for the job, where the exhibit and the loan paperwork may disagree about who carries a loss.
The additional insured, waiver and priority rows
Additional insured wording asks that a named party, such as the owner or the general contractor, be treated as an insured under your policy for work you do for them. It is added by endorsement, and a certificate that mentions it does not create it. A waiver of subrogation asks your carrier to give up a right against that party after a loss, and primary and non-contributory wording asks about the order in which policies respond. Each is an endorsement, and each is a request a carrier may or may not agree to write.
Read the exact sentence the exhibit uses, ask your agent which endorsement fits, and ask to see the issued form before you rely on it. Those three rows, and how they sit beside the liability line, are taken up further in general liability and workers’ compensation requirements.
The certificate rows: holder, names and notice terms
A certificate is a printout of the policies as they stood when it was issued. It lists a holder, the policy dates and limits, and may refer to endorsements that exist. Changing a policy takes an endorsement, not a certificate.
The holder’s legal name and address must match the contract. A missing suffix, an old name or a parent company in place of the entity that signed can send the certificate back. Copy the names from the contract and send them to your agent as text, not from memory.
The notice-terms row is the one that asks whether the holder will be told if a policy ends. A policy may or may not provide for that, and your agent can read the form in hand and report what it allows. If it does not, take the mismatch to the person who wrote the exhibit.
Real-World Scenario: An excavation contractor wins a pad and utility package and sends the certificate the day before the pre-construction meeting. It names the general contractor’s parent company, not the entity on the subcontract, and it refers to additional insured wording that the policy does not carry. The general contractor’s office returns it. The crew waits, the machines sit and the start slides while the owner and the agent trade corrections.
General liability and workers’ compensation
Those two lines already have a post of their own. Read what general liability and workers’ compensation ask for on a bid for how each is requested, and come back here for the rest of the table.
Find those rows in your exhibit and send them to your agent with the others. The state a crew works in shapes the workers’ compensation side, and the state-by-state pages are a starting point for the job’s state. A federal workers’ compensation directory points to the state offices.
Locates, safety rules and bonds sit outside the policies
An exhibit may refer to locating and trench safety, and no policy stands in for either. The call center for locate requests is where a dig begins, and OSHA publishes the Subpart P trench rules the crew works under. A bid that asks for a bond is asking for a separate instrument issued by a surety, and a bond is not insurance.
Where the exhibit asks you to confirm that locates are requested before a dig, the answer is a habit your foreman can show, such as a dated request kept in the job file. Where it asks about trench protection, the answer is the person on your crew who is responsible for the trench each day, named in writing. For plain names of the lines an exhibit can list, the SBA business insurance guide is a short reference.
What to send before you price the job
Send the exhibit whole and send it early, because a carrier may need time for endorsements. If a deadline is already close, say so in the opening line of your message, so the agent can sort the rows by what could take longest.
- The insurance pages and addenda. The version issued for this job, with its date.
- The legal names. The entity on the contract and the holder, copied as printed.
- Your table. The rows you built, with the blanks showing.
- The scope and the fleet. What the crew will dig, and which machines and trucks go.
- The proof date. The day the holder must have the certificate.
Add a short note on how the work may change. A pad that could turn into a utility trench, or a dig that may need a hired hauler, can move a row from one policy to another, and the agent can only match what you describe.
Attach it to a quote request and point to the blank rows. For the program behind those rows, excavation insurance lays out the lines.